Featured project

A 1 GW pipeline,from ground to grid.

Eleven named projects across South Africa. Utility-scale solar PV with battery storage — up to the 49 MW Middelburg flagship coming online in 2026.

Middelburg Solar Farm — 49 MW flagship

Middelburg Solar Farm

49 MW · Mpumalanga · PPA signed · COD 2026

~1 GWIn development and pipeline
11Named projects
49 MWFlagship (Middelburg)
600 MWEarly-stage pipeline
Pipeline

All projects

Our pipeline spans five South African provinces — Limpopo, Mpumalanga, KwaZulu-Natal, the Western Cape, and the Karoo. Sites were selected for three things at once: solar resource quality, proximity to grid infrastructure or industrial load, and landowner relationships that survived the months of due diligence before MOU.

Beyond the named pipeline

Around 600 MW additional in early-stage development for 2028–29. Project-by-project disclosure happens at financial close, not before.