
Helping South African industry transition to renewable power.
No upfront capital investment. Tailored power contracts with long-term pricing predictability.
Partner with a BEE Level 1 renewable energy developer
As a BEE Level 1, woman-owned developer with an approaching 1 GW pipeline, AEEG brings structural compliance advantages that multinational competitors cannot replicate. Our wheeled and on-site PPA structures deliver energy at a fraction of Eskom's tariff with long-term escalators capped at signing.
By choosing to procure from AEEG, your organisation accesses utility-scale renewable energy built on South African land, by South African teams, with BEE compliance baked into the ownership structure — not retrofitted at tender stage.

Reliable power with price predictability
We work with mining operations, smelters, and heavy industry across Mpumalanga, Limpopo, and KZN. Wheeled solar PPAs remove load-shedding exposure on the contracted portion of demand, with tariffs locked at signing.
- Tariffs at a fraction of Eskom — R 0.80/kWh modelled
- Long-term contracts with capped escalators
- No upfront capital required
- Load-shedding mitigation on contracted demand

Clean energy for operations of every scale
From grain mills in the Swartland to agri-processing in the Overberg, our PPA structures work for commercial operations that need 5–100 MW of clean generation without the capital outlay of self-build.
- Both wheeling and direct on-site structures available
- Tailored to your load profile and consumption pattern
- ESG and Climate Change Bill compliance built in
- Carbon reporting your auditors can verify
Advancing climate goals through local energy supply
As national and provincial governments work toward IRP targets, utility-scale renewable energy is part of the solution — decarbonising the grid while creating local jobs and tax revenue. AEEG is REIPPPP bid-eligible and structurally aligned with the JET framework.
Government →
How it works
MOU and technical fit
Site assessment, load-profile match, grid availability. 4–8 weeks.
PPA negotiation
Long-term power purchase agreement, tariff structure, escalators, performance guarantees. 8–16 weeks.
Construction
24–36 months for typical 20–100 MW projects. AEEG manages end-to-end.
Commercial operation
Long-term operations and reporting. Predictable cost base, predictable carbon position.
From first conversation to commercial operation on a typical 20–100 MW project: 24–36 months.
Reference projects

Buy renewable energy
Tell us about your operation and our team will be in touch within 48 hours.